April 16, 2009
Mid Project Engineering Challenges
Today while we were in the design lab, the group learned that the robot has to be capable of dropping two payloads at different locations, contrary to the assumed one payload requirement. As panic nealry filled the room, the group circumvented the problem through quick thinking and strong communication.
For starters, each member presented a different solution to address the problem. Talks were heated but the final solution is a combination of the best parts from each suggestions. Currently, the arm design is the process of being exstended to meet the new requirement of two payloads.
In sum then, as we tackle every new challenge, we are learning that the group must come to a strong agreement and understand, plus that we will need more Dunkin Donuts Coffee.
Labels:
Communication,
Engineering,
Problem Solving,
Project Managment,
Stevens
April 14, 2009
Presentation Well done.
Anthony, I just checked. Your package is with me.
-Bismark
-Bismark
Sent from my iPhone
IMPORTANT: Bag Lost
Hey guys,
When we left class today did anyone happen to pick up the white plastic ACE Hardware bag? I had forgotten it in my rush to leave, and there is some important building materials in there, along with my pocketknife. If anyone has it please let me know ASAP...
Thanks,
Anthony
When we left class today did anyone happen to pick up the white plastic ACE Hardware bag? I had forgotten it in my rush to leave, and there is some important building materials in there, along with my pocketknife. If anyone has it please let me know ASAP...
Thanks,
Anthony
April 13, 2009
Subscribe to:
Posts (Atom)



