Hey Guys,
The new site is up at http://www.freshtechoutthebox.com/
Use this link to submit posts.
http://freshtechoutthebox.com/submit
Thanks!
Phil
July 10, 2009
June 21, 2009
New Technology Site
Hey Guys,
I am preparing to launch a new blog called "Fresh Tech Out the Box" and I would like to invite you guys to contribute. Fresh Tech will be dedicated to everything in the technical world, whether there are new products coming out, applications, industry concepts, career opportunities or good old open source/hacking tips. As fellow Engineering students, I know yous guys are pretty involved with the technical world and that is why I am inviting you guys to participate. Shoot me an email or reply to this posted if you are interested.
Hope Summer is going well,
Phil
I am preparing to launch a new blog called "Fresh Tech Out the Box" and I would like to invite you guys to contribute. Fresh Tech will be dedicated to everything in the technical world, whether there are new products coming out, applications, industry concepts, career opportunities or good old open source/hacking tips. As fellow Engineering students, I know yous guys are pretty involved with the technical world and that is why I am inviting you guys to participate. Shoot me an email or reply to this posted if you are interested.
Hope Summer is going well,
Phil
April 23, 2009
Extra Lab Hours
Hey Team,
My 6:00PM class is cancelled for tonight so I will be at the lab tonight.
-Phil
My 6:00PM class is cancelled for tonight so I will be at the lab tonight.
-Phil
April 21, 2009
Weekly Update #3
Hey everyone,
So far progress on the robot has been awesome. Although we had to make some significant changes to the initial design, it can now drop two payloads at once, in two different locations. In fact, the changes to the design were even used as a basis for Experiment #3!
Phil has nearly completed the programming aspect; the LabView VI effectively controls the joystick, only now we just need to connect it to the finished robot in order to demonstrate it's potential.
The hardware construction of the robot is also nearly complete. The new arm assembly has been completed, now it just needs to be attached to the rest of the robot, which is supported by a balance mechanism. We also need to wire everything together; luckily we were able to obtain a spare circuit this week, significantly reducing the construction time.
Ultimately, this coming week the robot will be completed and tested. Given the extraordinary progress Design Spine has made in all aspects of this project, I can only see much success in this robot's performance.
- Anthony
So far progress on the robot has been awesome. Although we had to make some significant changes to the initial design, it can now drop two payloads at once, in two different locations. In fact, the changes to the design were even used as a basis for Experiment #3!
Phil has nearly completed the programming aspect; the LabView VI effectively controls the joystick, only now we just need to connect it to the finished robot in order to demonstrate it's potential.
The hardware construction of the robot is also nearly complete. The new arm assembly has been completed, now it just needs to be attached to the rest of the robot, which is supported by a balance mechanism. We also need to wire everything together; luckily we were able to obtain a spare circuit this week, significantly reducing the construction time.
Ultimately, this coming week the robot will be completed and tested. Given the extraordinary progress Design Spine has made in all aspects of this project, I can only see much success in this robot's performance.
- Anthony
April 20, 2009
Experiment 3
Hey Everyone,
Experiment 3 is due tomorrow plus on top of that, we have a huge chemstry test. I have collected the data for the experiment so all we have to do is format it in a report. I leave work at 4 today so I should be back in Hoboken by 5. I am free anytime after that so lets select a time for us to meet up and finish quickly so we can study for chem.
-Phil
Experiment 3 is due tomorrow plus on top of that, we have a huge chemstry test. I have collected the data for the experiment so all we have to do is format it in a report. I leave work at 4 today so I should be back in Hoboken by 5. I am free anytime after that so lets select a time for us to meet up and finish quickly so we can study for chem.
-Phil
April 16, 2009
Mid Project Engineering Challenges
Today while we were in the design lab, the group learned that the robot has to be capable of dropping two payloads at different locations, contrary to the assumed one payload requirement. As panic nealry filled the room, the group circumvented the problem through quick thinking and strong communication.
For starters, each member presented a different solution to address the problem. Talks were heated but the final solution is a combination of the best parts from each suggestions. Currently, the arm design is the process of being exstended to meet the new requirement of two payloads.
In sum then, as we tackle every new challenge, we are learning that the group must come to a strong agreement and understand, plus that we will need more Dunkin Donuts Coffee.
Labels:
Communication,
Engineering,
Problem Solving,
Project Managment,
Stevens
April 14, 2009
Presentation Well done.
Anthony, I just checked. Your package is with me.
-Bismark
-Bismark
Sent from my iPhone
IMPORTANT: Bag Lost
Hey guys,
When we left class today did anyone happen to pick up the white plastic ACE Hardware bag? I had forgotten it in my rush to leave, and there is some important building materials in there, along with my pocketknife. If anyone has it please let me know ASAP...
Thanks,
Anthony
When we left class today did anyone happen to pick up the white plastic ACE Hardware bag? I had forgotten it in my rush to leave, and there is some important building materials in there, along with my pocketknife. If anyone has it please let me know ASAP...
Thanks,
Anthony
April 13, 2009
April 12, 2009
Weekly Update
Hey guys, I will second Anthony's suggestion to meet tomorrow to practice for the presentation. I will also suggest the time to meet to be 6:00pm if that will be fine with everyone. In addition, Phil and I had the drivers for the PS3 controller so we will try that and hopefully we can finish the experiment as originally planned. Moreover, I am confident that we can finish both the hardware and software part by the end of this week.
-Bismark.
-Bismark.
Sent from my iPhone
Sent from my iPhone
Weekly Update 4/12
Hey everyone,
Looks like so far our group has been doing fantastic. I can see us really making a good impression for the presentation.
I figured that its better if we all worked on the presentation together, that way we will be more in sync and professional (we WILL do at least one practice run), so can we meet sometime tomorrow? (that would be Monday the 13th). Also, I can't meet after 9:00 PM. sorry.
As for Tuesday, I think we should divide and continue to conquer. Me and Bismark will work on the hardware part, I will have the arm done by tomorrow, while Phil and Tom can continue to program the joystick. On that note, I wasn't able to get an Xbox controller =(, but if we really can't use the joystick I guess I find a way to get one.
I think that we should have all of the robot done (i.e. hardware and programming) by the end of this week. That way, we can relax for the last two weeks a bit, and just work on testing the thing. I know this is a bit ambitious, but I'm willing to stay after class on Tuesday (my psych class is cancelled for that day) and talking with Phil for extra lab hours. Let me know what you guys think.
As always, keep up the good work everyone!
- Anthony
Looks like so far our group has been doing fantastic. I can see us really making a good impression for the presentation.
I figured that its better if we all worked on the presentation together, that way we will be more in sync and professional (we WILL do at least one practice run), so can we meet sometime tomorrow? (that would be Monday the 13th). Also, I can't meet after 9:00 PM. sorry.
As for Tuesday, I think we should divide and continue to conquer. Me and Bismark will work on the hardware part, I will have the arm done by tomorrow, while Phil and Tom can continue to program the joystick. On that note, I wasn't able to get an Xbox controller =(, but if we really can't use the joystick I guess I find a way to get one.
I think that we should have all of the robot done (i.e. hardware and programming) by the end of this week. That way, we can relax for the last two weeks a bit, and just work on testing the thing. I know this is a bit ambitious, but I'm willing to stay after class on Tuesday (my psych class is cancelled for that day) and talking with Phil for extra lab hours. Let me know what you guys think.
As always, keep up the good work everyone!
- Anthony
April 6, 2009
Meeting 4/5/09
Hey Guys,
I'm working 5-9 tonight but I think we should definitely meet after that. How is everyone's availability for my room, 9:30PM tonight?
-Phil
Sent from my Windows Mobile Phone
I'm working 5-9 tonight but I think we should definitely meet after that. How is everyone's availability for my room, 9:30PM tonight?
-Phil
Sent from my Windows Mobile Phone
April 5, 2009
Updated Status
Hey Guys,
Since we are not meeting tonight, I wanted to let everyone know that I am currently working on the Joystick program to be ready for Tuesday's experiment.
-Phil
Since we are not meeting tonight, I wanted to let everyone know that I am currently working on the Joystick program to be ready for Tuesday's experiment.
-Phil
April 3, 2009
April 1, 2009
Goooo team!!!
I just wanted to tell you guys that we are doing an okay job. But we could be doing better if we had a team name. We should have one to bring us together as a team. Get on it!
Ps:Trinity is the shit
Sent from my iPhone
March 31, 2009
E122: Week 10 Update
This week, our Design team completed and submitted their Request for Proposal for the project. This comprehensive, 20+ page document serves as a full-scale summary of what the entire project entails, while serving to actively demonstrate the clear advantages the "Retrieval Arm" design has over other Search and Rescue Robots.
The RFP was completed in a timely and effective manner, with all the group members participating by working on individual parts. Phil handled the entire Project Plan section, which covered areas of time management and division of labor. Bismark managed the graphic aspect of the project, creating, most notably, a 3D model and accompanying engineering drawing of the Arm feature using the Dassault SolidWorks engineering supplement. Tom managed the financials for the project, along with a Context Stakeholder analysis and a full flowchart for the LabView program. As the Team Leader, I put the report's components together, along with fabricating a full Conceptual Design Analysis.
Of particular note is the special "logo" Phil created using Photoshop. This appears on the RFP's title page, along with being the header on the Road Map page (table of contents). Combined with our unique design (which takes into consideration environmental, cost and sustainability concerns), and our blog-based publicity machine (groundbreaking for a Stevens Design Lab, as far as we know), this gives Stevens Design Spine a special identity, a sense of character which, in my opinion, makes our group a true standout.
In terms of areas of improvement, there are few places where I can find fault in this project so far. I would have to say the most difficult part may be actually fitting the finished product to the design in the RFP; for example, we have already ruled out using a Styrofoam arch for the "shroud" instead opting for a more stable PVC shield.
This week, we are currently comparing two different "joystick" apparatus, a Logitech PC model and a USB Sony DualShock, as seen in the PlayStation 3. Phil is currently building a LabView program to test each, while Bismark is building the "shroud" of the robot, continuing its construction. For next week, we will continue work on both aspects of the project, as the joystick testing will culminate in two weeks, in the write-up for Experiment 3, due in two weeks. More information on that will be posted soon.
In terms of how our group is doing, we are on a very smooth course with no problems thus far, and I don't see any problems developing anytime soon. As team leader, I can say that I am proud to work with a group of such dedicated, insightful, and resourceful group of engineers.
- Anthony
The RFP was completed in a timely and effective manner, with all the group members participating by working on individual parts. Phil handled the entire Project Plan section, which covered areas of time management and division of labor. Bismark managed the graphic aspect of the project, creating, most notably, a 3D model and accompanying engineering drawing of the Arm feature using the Dassault SolidWorks engineering supplement. Tom managed the financials for the project, along with a Context Stakeholder analysis and a full flowchart for the LabView program. As the Team Leader, I put the report's components together, along with fabricating a full Conceptual Design Analysis.
Of particular note is the special "logo" Phil created using Photoshop. This appears on the RFP's title page, along with being the header on the Road Map page (table of contents). Combined with our unique design (which takes into consideration environmental, cost and sustainability concerns), and our blog-based publicity machine (groundbreaking for a Stevens Design Lab, as far as we know), this gives Stevens Design Spine a special identity, a sense of character which, in my opinion, makes our group a true standout.
In terms of areas of improvement, there are few places where I can find fault in this project so far. I would have to say the most difficult part may be actually fitting the finished product to the design in the RFP; for example, we have already ruled out using a Styrofoam arch for the "shroud" instead opting for a more stable PVC shield.
This week, we are currently comparing two different "joystick" apparatus, a Logitech PC model and a USB Sony DualShock, as seen in the PlayStation 3. Phil is currently building a LabView program to test each, while Bismark is building the "shroud" of the robot, continuing its construction. For next week, we will continue work on both aspects of the project, as the joystick testing will culminate in two weeks, in the write-up for Experiment 3, due in two weeks. More information on that will be posted soon.
In terms of how our group is doing, we are on a very smooth course with no problems thus far, and I don't see any problems developing anytime soon. As team leader, I can say that I am proud to work with a group of such dedicated, insightful, and resourceful group of engineers.
- Anthony
March 30, 2009
Subscribe to:
Posts (Atom)




